The rough-in drain (DWV) lines is completed and ready for testing. To test it is capped off and filled with water. After leaving these lines filled with water for over two days, no leaks were found. The pictures are from different angles to show each hook up. The toilet and bathtub drains needed to be placed precisely as they are not easy to move after the concrete is poured. Ha!